Silage in the silage operation steps

1. Harvesting: Silage corn and cereal crops, harvest time from milk ripening stage to wax ripening stage; gramineous grasses as heading stage; leguminous pastures as budding and flowering stage.

2. Transportation: Harvested materials should be transported to the silo in time.

3, chopped, cellar: The storage silage cut into 2-5 cm grass festival, storage should be followed with the equipment with the practical stepping tight, each to cut the stack height of about 30 cm In particular, the edges should be compacted. The loading capacity should be 30 cm higher than the pit, and a layer of straw should be tightly discharged at the top and then covered with a plastic film.

4. Cover soil seal: Immediately after covering the plastic film, cover the soil, cover the soil with a height of 30-50 cm, use a shovel to photograph the soil surface and show the shape of the bottom of the pot to facilitate drainage.

Guangzhou Zhongzhinan Supply Chain Co.,Ltd. , https://www.zhongzhinanlighting.com

Posted on